According to:
Article
3.10.5 of the General Specification for Safety, Hygiene and
Occupational Health at Construction and Municipal Construction Sites:
The maintenance of electrical equipment and lines shall comply with the
following provisions:
When
electrical equipment is under maintenance or circuits are repaired,
live-line operations are strictly prohibited. The power supply of the
relevant distribution circuits and equipment should be cut off and
isolated. It is necessary to check and confirm that the power supply has
been cut off. The door of the corresponding distribution room, the
distribution box or the switch for cutting off the power supply should
be locked. Warning signs should be set up in prominent positions such as
the lock or the door of the box, the wall, etc.
When
electrical equipment malfunctions, a voltage detector should be used
for inspection. Maintenance can only be carried out after confirming
that the power is cut off. A power-off sign reading "Do not Close the
Switch, Work in Progress" should be hung at a prominent position on the
control switch. Power cut-off and supply must be handled by designated
personnel.
3.10.5 The maintenance of electrical equipment and circuits shall comply with the following provisions:
When
electrical equipment is under maintenance or circuits are repaired,
live-line operations are strictly prohibited. The power supply of the
relevant distribution circuits and equipment should be cut off and
isolated. It is necessary to check and confirm that the power supply has
been cut off. The door of the corresponding distribution room, the
distribution box or the switch for cutting off the power supply should
be locked. Warning signs should be set up in prominent positions such as
the lock or the door of the box, the wall, etc.
When
electrical equipment malfunctions, a voltage detector should be used
for inspection. Maintenance can only be carried out after confirming
that the power is cut off. At the obvious position of the control
switch, a power-off sign reading "Do not Close, Work in Progress" should
be hung. Power cut-off and supply must be handled by designated
personnel.
It is strictly prohibited to make appointments for power cut-off and supply for the operation of lines and equipment.